While migrating a Control Compliance Suite (CCS) installation ( 9.0,10.0, 10.5.1, 11.0), does the new system have to be at the same PCU level as the original system?

While migrating a Control Compliance Suite (CCS) installation ( 9.0,10.0, 10.5.1, 11.0), does the new system have to be at the same PCU level as the original system?

Was this article helpful?

Thank you for your feedback!

Provide feedback on this article

Thank you for your feedback!
Print Article
Related Products
Subscribe to this Article
Manage your Subscriptions
Search Again

Situation

Solution

Imported Document Id